What you get
- One BOQ from tender to final bill, not a new spreadsheet at each stage
- Margin per item known: what the client pays against what the subcontractor costs
- Running bills and IPCs built from measured progress, not retyped
BOQ · IPC · Pakistan
Prepare a priced BOQ in PKR, bring in the client's BOQ from Excel, sublet items to subcontractors, and bill progress against it, with WHT and net receivable worked out on every document.


Overview
In most Pakistani contracting firms the bill of quantities lives three separate lives. The estimator prices it in one spreadsheet for the tender. The quantity surveyor copies it into another to prepare running bills. The accounts office keeps a third version to work out what subcontractors are owed. By the third IPC the three disagree, and nobody can say which quantity or which rate is the one the contract was actually signed on.
BOQ software ends that by keeping one BOQ as structured items, each with its unit, quantity, and rate, and letting every later step read from it. The priced BOQ becomes the quotation. The awarded BOQ becomes the contract and the budget. Measured progress is recorded against the same items, so a running bill is a calculation over the BOQ, not a copied tab with last month’s mistakes in it.
Smart Construction does this in PKR, with the deductions Pakistani contracts actually carry. Withholding tax set once in Settings appears on the BOQ PDF and Excel as Less: WHT and net receivable. IPCs carry retention and advance recovery. And on the Scale plan, contract BOQ control links each item the client awarded to the subcontractors it is sublet to, so the margin on every item is visible and no subcontractor can be certified beyond their share of the work.
How it works
The same sequence your office and sites already follow, in one system instead of registers, spreadsheets, and WhatsApp threads.
Price items from your own rates, or import the client’s BOQ from Excel, PDF or a photo. Every item keeps its unit, quantity and rate.
The BOQ becomes a quotation on your letterhead with taxes, Less: WHT and the net amount, in PDF or Excel.
The awarded BOQ becomes the contract. Items you do not do yourself are sublet to subcontractors at their own rates.
Measured quantities are recorded against BOQ items, for your own work and each subcontractor’s.
Progress rolls up into the client IPC with retention, advance recovery and WHT, and into each subcontractor’s certificate.
Margin and exposure per item, per subcontractor and per project, from the same BOQ the job was won on.
Capabilities
The daily work below is on every plan; some advanced controls start on Growth or Scale. The pricing page shows what each plan includes.
Items with units, quantities and rates from your own rate library, totalled with the taxes you set, and produced as a quotation on your letterhead in PDF or Excel.
AI Import reads the client’s Excel BOQ, a PDF, or a photo, maps the columns, and asks about anything it is not sure of before it creates the items.
Withholding tax is defined once and shown on every BOQ document as a deduction with the net amount, so the figure the client sees matches the figure your accounts expect.
Each awarded item can be sublet to one or more subcontractors at their own rates. Margin and exposure are reported per item and per subcontractor (Scale plan).
Quantities recorded against BOQ items roll up into the client IPC and each subcontractor’s certificate, with previous bills, retention and advance recovery carried automatically.
A variation changes the item it belongs to, so the revised quantity and value stay traceable from the original BOQ to the final bill.
Before and after
The same work, run the way most contractors run it today and the way it runs on the platform.
Side by side
What most contractors in Pakistan use for this today, and where each one stops.
| What you need | Smart Construction | Excel or a register | General accounting software |
|---|---|---|---|
| Preparing the priced BOQ | Items from your own rate library, priced in PKR | Rebuilt from the last file, formulas copied by hand | Not designed for BOQ items |
| WHT and net receivable | Set once, shown on every BOQ PDF and Excel | A formula someone has to remember | On the invoice only, not the BOQ |
| Client BOQ vs subcontractor BOQ | Linked per item, with margin and exposure | Two files compared by eye | Not available |
| Running bills and IPCs | Built from recorded progress, previous bills carried | Copied tab per bill, errors carried forward | Invoices without measured quantities |
| Variations | Kept against the item they change | A new row, often in a new version of the file | A separate invoice line |
Use cases
Recognisable scenarios from construction businesses operating in Pakistan.
Benefits
Tender, contract, budget, and billing all read from the same items, so there is nothing to keep in step by hand.
What the client pays for an item against what it costs you to deliver it, visible while the job is running.
WHT, retention and advance recovery are applied the same way on every document.
A payment ceiling per sublet stops overpayment against work the client has not certified.
Importing the client’s BOQ removes the retyping step that eats most of the tender window.
Every change to scope stays on the item it changed, from the first BOQ to the final account.
Price in PKR
Published prices, no foreign-currency billing. Plans start at PKR 10,000 a month, or PKR 9,000 a month on annual billing, plus a one-time setup fee.
Every plan includes daily site and office work, the mobile app, and WhatsApp alerts. Compare all plans.
Terminology
Plain definitions of the terms Pakistani contractors and consultants use day to day.
Questions
Still have a question?
Ask our team during Pakistan business hours, in English or Urdu.
+92 333 2466662Chat on WhatsAppBOQ software holds the bill of quantities as structured items with quantities, units and rates, instead of a typed spreadsheet. That lets the same BOQ price the tender, drive the budget, and value progress for each running bill.
Yes. AI Import (from the Growth plan) reads your Excel sheet, a PDF, or a photo of the BOQ, shows you what it understood and asks about anything unclear before a single record is created.
Yes. Taxes are set once in Settings, and the BOQ PDF and Excel show Less: WHT and the net receivable. Older BOQs keep the rate they were made with.
Yes, on the Scale plan. Contract BOQ control links each awarded item to the subcontractors it is sublet to, so you see your margin and exposure per item, and no subcontractor can be paid beyond their share of the work.
Estimates and the BOQ calculator start on Growth, along with subcontractor certificates (IPC) and AI Import. Contract BOQ control, linking the client BOQ to subcontractor BOQs, and withholding tax settings are on Scale.
An estimate is how you arrive at the price; the BOQ is the itemised result the client sees and the contract is signed on. Our cost estimation page covers rate analysis and pricing in more depth.
Yes. A BOQ can be produced as a PDF on your letterhead or as an Excel file, both showing taxes, Less: WHT and the net amount.
Free demo
A 30 to 45 minute walkthrough, in English or Urdu, run on the work you do. Demo requests are answered within one business day.
We respond to qualified enquiries quickly during Pakistan business hours.
Book a walkthrough built around your own workflows, or compare PKR plans before you subscribe.
Call +92 333 2466662 during Pakistan business hours, or book online.