Sand cost Rs 7,406 and crush Rs 10,973 a 100 cft truck on average in the cities surveyed in August 2026. Work out concrete in cft for a slab, beam, column or footing, with the cement, sand and crush for any mix and the cost.

  • Free, no sign-up
  • Volume in cft and cubic metres
  • Works on your phone

Calculator

Work out the concrete

Choose the shape and give its size, or type a volume, then pick the mix. The answer is the volume, and the cement, sand, crush and water to buy.

The concrete
Shape
A slab, beam, column or footing: its length, width and depth. For a column, its height is the length.
Feet and inches work: 40'-6".
For a beam, type 9" for 9 inches.
A slab's thickness or a beam's depth.
Pieces of this size.
Mix
M15 1:2:4: the usual mix for the slabs, beams and columns of a house.
Prices, for a cost

Use the prices your suppliers quote you, and leave out any you do not have.

A guide from the Pakistan Bureau of Statistics, August 2026: Rs 1,555 on average; Lahore Rs 1,590, Karachi Rs 1,465, Islamabad Rs 1,532 a bag.
Coarse sand priced by
A guide from the Pakistan Bureau of Statistics, August 2026: Lahore Rs 7,998, Karachi Rs 8,233, Islamabad Rs 13,631 a trolley of pit sand. Prices differ a lot with the kind of sand.
Crush priced by
A guide from the Pakistan Bureau of Statistics, August 2026: Lahore Rs 18,773, Karachi Rs 9,253, Islamabad Rs 16,522 a trolley.

Working out a whole house? The material calculator adds up concrete, walls, plaster and steel together, by the same rules as this page.

Concrete and what goes into it

Volume of concrete600 cft16.99 cubic metres of 1:2:4 (M15). Loose and dry, its cement, sand and crush come to 924 cft.
Cement
108 bags5,400 kg in 50 kg bags
Coarse sand
277.2 cft2.77 trolleys of 100 cft
Crush
554.4 cft5.54 trolleys of 100 cft
Water
2,640 litresFor mixing

Before wastage

Cement2% is added, then whole bags
105.6 bags
Coarse sand5% is added
264 cft
Crush5% is added
528 cft

Water is taken at half the cement's weight, 25 litres to a bag. More water makes concrete easier to place and weaker, so add only what the mix needs.

Prices

Sand and crush prices in Pakistan, August 2026

In the Pakistan Bureau of Statistics' survey for August 2026, a truck of 100 cft of pit sand cost Rs 7,406 on average across 34 cities, from Rs 2,932 in Hyderabad to Rs 15,165 in Abbottabad. Crush cost Rs 10,973 across 35 cities, from Rs 4,466 in Khuzdar to Rs 18,996 in Sahiwal.

Sand (black pit), August 2026
CityPer truck of 100 cftPer cft
LahoreRs 7,998Rs 79.98
KarachiRs 8,233Rs 82.33
IslamabadRs 13,631Rs 136.31
RawalpindiRs 13,558Rs 135.58
FaisalabadRs 7,000Rs 70.00
MultanRs 7,771Rs 77.71
PeshawarRs 10,443Rs 104.43
QuettaRs 6,499Rs 64.99
HyderabadRs 2,932Rs 29.32
GujranwalaRs 8,500Rs 85.00
SialkotRs 8,000Rs 80.00
SargodhaRs 6,000Rs 60.00
AttockRs 5,850Rs 58.50
SahiwalRs 8,798Rs 87.98
JhangRs 4,000Rs 40.00
Dera Ghazi KhanRs 7,990Rs 79.90
VehariRs 12,000Rs 120.00
MianwaliRs 5,433Rs 54.33
BahawalpurRs 13,000Rs 130.00
BahawalnagarRs 10,066Rs 100.66
Rahim Yar KhanRs 6,000Rs 60.00
NawabshahRs 3,500Rs 35.00
SukkurRs 4,000Rs 40.00
LarkanaRs 4,327Rs 43.27
DaduRs 3,300Rs 33.00
AbbottabadRs 15,165Rs 151.65
BannuRs 4,090Rs 40.90
Dera Ismail KhanRs 3,466Rs 34.66
MingoraRs 8,500Rs 85.00
TurbatRs 7,000Rs 70.00
GwadarRs 7,000Rs 70.00
LoralaiRs 7,264Rs 72.64
KhuzdarRs 5,328Rs 53.28
Dera Murad JamaliRs 5,166Rs 51.66
Average of 34 cities surveyedRs 7,406Rs 74.06
Crush (bajri, rata), August 2026
CityPer truck of 100 cftPer cft
LahoreRs 18,773Rs 187.73
KarachiRs 9,253Rs 92.53
IslamabadRs 16,522Rs 165.22
RawalpindiRs 15,870Rs 158.70
FaisalabadRs 13,000Rs 130.00
MultanRs 11,426Rs 114.26
PeshawarRs 10,887Rs 108.87
QuettaRs 6,998Rs 69.98
HyderabadRs 4,732Rs 47.32
GujranwalaRs 16,000Rs 160.00
SialkotRs 18,000Rs 180.00
SargodhaRs 11,500Rs 115.00
AttockRs 15,199Rs 151.99
SahiwalRs 18,996Rs 189.96
JhangRs 11,400Rs 114.00
Dera Ghazi KhanRs 9,330Rs 93.30
VehariRs 16,327Rs 163.27
MianwaliRs 8,000Rs 80.00
BahawalpurRs 15,665Rs 156.65
BahawalnagarRs 18,000Rs 180.00
Rahim Yar KhanRs 18,000Rs 180.00
NawabshahRs 5,533Rs 55.33
Mirpur KhasRs 13,000Rs 130.00
SukkurRs 9,000Rs 90.00
LarkanaRs 6,329Rs 63.29
DaduRs 5,800Rs 58.00
AbbottabadRs 9,830Rs 98.30
BannuRs 5,365Rs 53.65
Dera Ismail KhanRs 6,000Rs 60.00
MingoraRs 7,500Rs 75.00
TurbatRs 7,000Rs 70.00
GwadarRs 7,000Rs 70.00
LoralaiRs 6,867Rs 68.67
KhuzdarRs 4,466Rs 44.66
Dera Murad JamaliRs 6,500Rs 65.00
Average of 35 cities surveyedRs 10,973Rs 109.73

Source: Pakistan Bureau of Statistics, Urban Inter-City Consumer Prices of Construction and Energy Items, August 2026, published September 2026. These are the prices the survey found in each city's markets; a supplier's price varies with the brand, the quantity and delivery.

Reference

Concrete mix chart

The cement, sand, crush and water in each nominal mix, per 100 cft and per cubic metre of concrete.

Per 100 cft of concrete
MixCement (bags)Cement (kg)Sand (cft)Crush (cft)Water (litres)
1:4:8 (PCC)9.4847447.494.8237
1:3:6 (PCC)12.3261646.292.4308
1:2:4 (M15)17.68804488440
1:1.5:3 (M20)22.41,1204284560
Per cubic metre of concrete
MixCement (bags)Cement (kg)SandCrushWater (litres)
1:4:8 (PCC)3.351670.47 m³, 16.7 cft0.95 m³, 33.5 cft84
1:3:6 (PCC)4.352180.46 m³, 16.3 cft0.92 m³, 32.6 cft109
1:2:4 (M15)6.223110.44 m³, 15.5 cft0.88 m³, 31.1 cft155
1:1.5:3 (M20)7.913960.42 m³, 14.8 cft0.84 m³, 29.7 cft198

Before wastage, at 1.54 cft of dry materials to a cft of concrete, 1.25 cft to a 50 kg bag and water at half the cement's weight. For your job the calculator adds 2% to cement and 5% to sand and crush, and rounds cement up to whole bags.

How it is worked out

From volume to bags, sand and crush

Concrete is measured by its volume. For anything rectangular, a slab, a beam, a column or a footing, multiply the length by the width by the depth, all in feet: a 40 x 30 ft slab 6 in thick is 40 × 30 × 0.5 = 600 cft. A round column or pile is 3.1416 times its radius squared times its height, so a 12 in column 10 ft high is 7.85 cft. A cubic metre is 35.31 cft.

Why 1.54? Cement, sand and crush are measured loose and dry, and they fit into less room once water is added: the sand settles into the gaps between the stones, the cement into the gaps in the sand, and the water lets it all pack down. So it takes about 1.54 cft of dry materials to make 1 cft of concrete. The figure also allows for sand that bulks when it is damp. Estimates use anything from 1.52 to 1.57; this calculator uses 1.54, as the material calculator does.

The dry volume is then split by the mix. 1:2:4 is seven parts: one of cement, two of sand and four of crush. For 100 cft of concrete that is 154 cft dry: 22 cft of cement, which at 1.25 cft to a 50 kg bag is 17.6 bags, 44 cft of sand and 88 cft of crush. Water is taken at half the cement's weight, 440 litres. Last, 2% is added to the cement, rounded up to whole bags, and 5% to the sand and crush.

M15 and M20 are grades of concrete named for their strength. The M is for mix, and the number is the strength a test cube reaches after 28 days, in newtons a square mm: 15 and 20, about 2,200 and 2,900 psi. 1:2:4 is the nominal mix taken for M15 and 1:1.5:3 the one taken for M20. 1:3:6 and 1:4:8 are plain concrete, laid with no steel in it under floors and footings.

A nominal mix is a fixed recipe by volume, measured out on site as a bag of cement to so many boxes of sand and crush, and it serves for ordinary work up to M20. A design mix is worked out in a laboratory from the actual cement, sand, crush and water to reach a stated strength, is batched by weight and is checked with test cubes. Grades above M20, and most ready-mixed concrete, are design mixes: go by the mix design for those, not a ratio. The structural drawings say which a job needs.

On site

Terms you will hear

PCC
Plain cement concrete, with no steel in it: lean 1:4:8 or 1:3:6, laid under footings and floors to give a clean, level base.
RCC
Reinforced cement concrete, cast round steel bars: slabs, beams, columns and footings, usually in 1:2:4 or 1:1.5:3.
Lenter
The word Pakistani sites use for an RCC roof slab, and for the day it is cast.
Curing
Keeping new concrete wet so it goes on gaining strength, by ponding water on a slab or covering it with wet sacking: usually for at least 7 days, and longer in hot weather.
Slump
A test of how wet a mix is. A cone of fresh concrete is lifted away and the drop measured; a big drop usually means too much water.
Shuttering
The steel or wooden forms and props that hold concrete in shape until it sets. It is not counted here.

Questions

Concrete questions

Still have a question?

Ask our team during Pakistan business hours, in English or Urdu.

+92 333 2466662Chat on WhatsApp
What is the sand price in Pakistan today?

The Pakistan Bureau of Statistics' survey for August 2026 found a truck of 100 cft of pit sand at Rs 7,406 on average across the 34 cities with a sand price, about Rs 74 a cft: Rs 7,998 in Lahore, Rs 8,233 in Karachi and Rs 13,631 in Islamabad. Prices ran from Rs 2,932 in Hyderabad to Rs 15,165 in Abbottabad. Sand is cheap where it is dug and dear where it is carted far, and coarse sand for concrete, such as Chenab or Lawrencepur sand, costs more than the pit sand the survey prices.

What is the crush (bajri) rate per truck?

In August 2026 a truck of 100 cft of crush cost Rs 10,973 on average across the 35 cities the Pakistan Bureau of Statistics surveyed, about Rs 110 a cft: Rs 18,773 in Lahore, Rs 9,253 in Karachi and Rs 16,522 in Islamabad. Prices ran from Rs 4,466 in Khuzdar to Rs 18,996 in Sahiwal. Crush is quarried stone, so the haul from the quarry is much of its price, and it costs more on the plains of Punjab than in cities near the hills.

How do I calculate the volume of concrete in cft?

Multiply the length by the width by the depth, all in feet, and by the number of pieces; a depth in inches is divided by 12 first. A 40 x 30 ft slab 6 in thick is 600 cft, and ten footings of 4 x 4 ft, 18 in deep, are 240 cft. A round column 12 in across and 10 ft high is 7.85 cft. Divide cft by 35.31 for cubic metres.

How much cement, sand and crush do I need for 1:2:4 concrete?

For every 100 cft, 17.6 bags of cement, 44 cft of coarse sand and 88 cft of crush, before wastage. With 2% on the cement and 5% on the rest, buy 18 bags, 46.2 cft of sand and 92.4 cft of crush. A 600 cft slab takes 108 bags, 277.2 cft of sand and 554.4 cft of crush, about 2.8 and 5.5 trolleys.

How much cement, sand and crush are in 1 cubic metre of concrete?

In 1:2:4, 6.2 bags of cement (311 kg), 0.44 cubic metres of sand (15.5 cft) and 0.88 cubic metres of crush (31.1 cft). In 1:1.5:3, 7.9 bags (396 kg), with 0.42 cubic metres of sand and 0.84 cubic metres of crush. In 1:3:6, 4.4 bags. These are before wastage.

Why is the dry volume of concrete 1.54 times the wet volume?

Because the dry materials pack into less room once water is added: the sand fills the gaps between the stones, and the cement the gaps in the sand. It takes about 1.54 cft of loose cement, sand and crush to make 1 cft of concrete, which also allows for sand that bulks when damp. Some estimates use 1.52 or 1.57, which changes the answer by a bag or two in a hundred.

What is the difference between M15 and M20 concrete, and which should I use?

The number is the strength a test cube reaches after 28 days: 15 and 20 newtons a square mm, about 2,200 and 2,900 psi. M15 is made as 1:2:4 and M20 as 1:1.5:3, which takes about 27% more cement. Most house slabs, beams and columns are 1:2:4, with 1:1.5:3 where the engineer asks for it, and lean 1:4:8 or 1:3:6 goes under footings and floors. Always follow the structural drawings.

How much water does concrete need?

About half the cement's weight, so 25 litres to a 50 kg bag: 440 litres for 100 cft of 1:2:4. More water makes concrete easier to place but weaker and more prone to cracks, so add only what the mix needs to be worked into place, and keep it wet afterwards while it cures.

Does the calculator include steel and shuttering?

No. It works out the concrete and what goes into it. Weigh the bars on the steel weight calculator, and for a roof slab the roof slab calculator adds the steel and the shuttering area too.

Plan every part of the building

Smart Construction plans every part of a building from the foundations up, prices it at the rates you pay and follows the buying on site.